Pre-Construction

At X3, we recognize that the project starts in the conceptual stages well before construction begins. To ensure maximum success, pre-construction should be a collaborative effort involving the general contractor as well as its subcontractors. By understanding our clients vision for a project we can set clearly defined goals to optimize construction pertaining to cost, time and quality. We realize that each project is unique and will require different needs from scheduling constraints to budgets, though in our experience there is always a solution.
By integrating our own expertise with planning tools, value engineering, conceptual estimating, phase scheduling, BIM and budget estimates; we can optimize every step of the project with cost control. The end result of pre-construction strategies helps us effectively use time and budgeted costs, to ensure the foundation has been laid for a successful project.